I am Vitruvius, a builder and engineer from the Roman world, and I understand the principles by which great structures are raised and cities are made healthy and strong. I share my knowledge of architecture, materials, and the very foundations of civil life, so that future generations may build anew with wisdom and durability. Let us construct a world that stands the test of time.
A Method for Locating and Securing Potable Water
May 13th 24 BCE
Last updated December 17th 2025
Before any foundation is laid or a single wall is raised, the first duty of the builder is to secure a supply of wholesome water. Without it, life cannot be sustained, and no settlement can prosper. I shall therefore set down the principles for finding this most essential element, not through arcane arts, but through the careful observation of nature itself. By studying the signs manifest in the soil, the growth of certain plants, and the behavior of morning vapors, one can locate subterranean springs. Following this, I will instruct on the proper method for digging and reinforcing a well, ensuring it provides a clean and enduring source for the community.
You will need:
A keen power of observation and a patient disposition.
A sturdy digging spade or mattock for excavation.
Buckets and a strong rope, or a windlass, for removing earth.
A bronze, lead, or unglazed earthenware vessel for testing moisture.
Hard, durable field stones or well-fired bricks for lining the well.
Mortar components: high-quality lime and clean, sharp sand.
Timber for shoring the shaft during excavation, if the soil is loose.
1. Seek the Signs in Surface Vegetation
Begin by surveying the land. Look for plants that cannot grow without moisture: thin rushes, wild willow, alder, ivy, and other such verdant species. Where these grow in abundance, particularly in a location not otherwise marshy, water is likely to be found not far beneath the surface. Nature herself thus points the way.
2. Observe the Morning Vapors
Before sunrise, lie down flat upon the ground in a promising location and observe the horizon. Where a light vapor or mist is seen to rise and hover, it is a sure indication of moisture evaporating from the earth below. This sign is most reliable in places sheltered from the wind, where the delicate vapors are not dispersed.
3. Excavate a Test Pit for Confirmation
Having identified a location by the previous signs, dig a pit not less than three feet square and five feet deep. As evening approaches, place your bronze or earthenware vessel upside down within the pit and cover the opening with reeds or leaves, weighted with earth. If water is present below, the interior of the vessel will be covered in drops of moisture by the morning.
4. Assess the Character of the Soil
While digging, note the type of earth. Black soil, loose gravel, red tufa, and carbuncular sand are all excellent signs, as water filters through them cleanly. Clay is less desirable, for it holds water but yields it sparingly. Hard, solid rock is the most difficult, though water of the finest quality is often found in its fissures.
5. Commence the Digging of the Well
Once a good source is confirmed, begin the main excavation. The shaft should be wide enough for a man to work comfortably. In loose or sandy soils, it is imperative to shore up the sides with timber planking as you dig, to prevent a collapse which would be fatal to the workman and ruin the project.
6. Construct the Well Lining with Sound Masonry
Upon reaching a plentiful supply of water, begin lining the well from the bottom upwards. Use hard stones or well-fired bricks laid in strong lime mortar. This casing is the permanent structure that holds back the earth and ensures the purity of the water against surface contamination. Build it as you would a temple foundation: with purpose and for permanence.
7. Ensure Proper Joints and Courses
Lay the stones or bricks in level courses, ensuring tight joints filled completely with mortar. A shoddy wall will fail, allowing soil to enter and foul the water. The integrity of the well depends entirely on the quality of this masonry work. Take no shortcuts.
8. Raise a Protective Wellhead
Extend the stone lining at least three feet above the surrounding ground level. This raised curb, or wellhead, serves to prevent surface runoff, debris, animals, and careless persons from falling into the water supply. A well must be protected to remain wholesome.
9. Allow the Water to Purge and Settle
After construction is complete, the water will be clouded with mud and residue from the mortar. It is necessary to draw out water repeatedly for several days until it runs clear and has lost any taste from the lime. Only then is the well truly complete and its water fit for consumption.